This offer is available on new building contracts signed from 9th February 2026 for eligible homes within the JG King Metro '100-Day Build Range' only.

The 100 Day Build Guarantee Applies To:
    •    Single storey homes within the JG King Metro '100-Day Build Range'
    •    Construction within JG King’s Melbourne Metro area only.
    •    Single storey homes with JG King’s standard design options only (no structural changes or custom modifications)
    •    '100-Day Build Range' standard inclusions and specifications only. 

The guaranteed build time applies exclusively to the construction from Site Start to notification of Completion of the home. 
It does not extend to works such as:
    •    Driveways, external brick or concrete paths and/or paving
    •    Retaining walls
    •    Landscaping
    •    Fencing


Eligibility for the 100 Day Build Guarantee is subject to the following conditions. 

Site Eligibility:

    •    Land must be titled and registered in the name of the customer at the time of contract execution.
    •    Site must be a greenfield site (no demolition required)
    •    Site must be sewered with bushfire requirement below BAL 19
    •    Applies only to sites with soil classifications of H1 or better. 
    •    Site must not require retaining walls.

Contract Compliance:

    •    All contract payments must be made on time as set out in the Building Contract
    •    Any post-contract variations requested after signing of the Building Contract may incur additional fees at the discretion of JG King and may alter/void the guaranteed build timeframe.
    •    Customer must not perform 'Owner Works' on site.
    •    Written confirmation must be received from JG King confirming customer qualification for the program.

Build Time Definition and Calculation:

100 Days Definition: 100 days means 100 business days, excluding Saturdays, Sundays, public holidays and the period between 21 December 2026 and 17 January 2027 inclusive. It will be extended by any extensions of time to which JG King is entitled pursuant to the Building Contract.
Construction Period Commencement: The Build Time commences from the date construction starts on site in accordance with the Building Contract (Site Start). Construction Period Completion: The Construction Period ends upon notification of Completion in accordance with the Building Contract.

Additional Time Allowances;
Homes that include any of the following features, or require additional works, may require additional build time beyond the guaranteed time frame.

    •    Independent inspections: An additional 10 business days per inspection, calculated from the date the Builder receives the inspection report.
    •    Rock excavation: An additional 10 business days where rock is encountered during excavation.

Important Disclaimers and Acknowledgements

The customer acknowledges and agrees that:
    •    Building Contract Prevails: These Terms & Conditions are to be read in conjunction with the Building Contract. Where there is any inconsistency, the Building Contract prevails.
    •    Land and Finance: JG King does not supply land. JG King is not in any way responsible for the provision of finance or credit assistance.
    •    Right to Amend: JG King reserves the right to amend or withdraw the 100 Day Build Guarantee terms and conditions at any time without notice.

Questions and Clarification
For questions about the 100 Day Build Guarantee or to determine if your project qualifies, please contact your JG King representative or visit our website www.jgkinghomes.com.au.
 
JG King Pty Ltd
ABN 21 006 627 210
Registered Building Practitioner CDB-U 49366 (VIC)